UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 1998082010085199
Version #: 003
Last Modified: 1999/02/25 09:52 EST
Date Issued: 2010/07/31 14:10 EDT
===============================================================================
P.I. Name Last: Becker First: Keir MI:
===============================================================================
Institution: University of Miami - RSMAS Research vessel required for:
Address: 4600 Rickenbacker Causeway _ Ancillary Only
Miami, FL 33149 X Principal Use
_ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 305-361-4661 Fax: 305-361-4632 Email: kbecker@rsmas.miami.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
F. N. Spiess MPL/SIO/UCSD C. De Moustier MPL/SIO/UCSD
===============================================================================
Proposal Title:
---------------
Long-term monitoring of off-axis hydrogeology on the Costa Rica Rift using an
instrumented wireline multi-packer system
===============================================================================
Large Program Name: Other Research Purpose: Instrumentation
If Other, specify: ODP If Other, specify:
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? N
Funded Grant? N NSF/OCE/ODP
Institutional Proposal #: Amount Requested: Area(s) of Operation:
$384,172 NP13
Agency Proposal #:
OCE-9819316 Lat/Long:
Renewal? N Start Date: 4/1/99 Begin: 1N 84W
Grant #: End Date: 3/31/02 End: 1N 84W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2000 Large 4 on site Apr/May/00 Jun/00
2001 Roger Revelle 15 on site Jan-Mar/01 see comments
2002 Atlantis 2 on site Jan-Mar/02 winter 01/02
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
4/15/2 Start: Intermediate: End:
Number in Science Party: see comments see comments see comments
12/15/4
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS X Alvin _ ABE
X Dynamic Positioning _ Multibeam _ SCS X ROV X 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
1. Note this is a collaborative program with MPL/SIO group, who will have
separate 2-year funding on OCE-9019780 (4/1/99-3/31/01). The MPL group will be
involved in the first two of our requested three cruises; these first two
cruises should therefore be scheduled respectively at beginning and end of
second project year. The RSMAS/PGC group is involved in a related project with
JOIDES Resolution that may be scheduled May-July, 2001, so scheduling the
second year Revelle cruise later than March 2001 may not be possible.
2. More details for multi-cruise request:
The first two cruises involve the MPL Control Vehicle to test and then deploy
long-term borehole instruments. The third cruise is a data recovery effort
about one-year after main deployment cruise, and is requested with ALVIN.
3 cruises requested here:
(1) Test cruise off San Diego early in year 2 using large DP-ship, 4 days on
site, start and end ports San Diego
(2) Deployment cruise late in year 2, preferrably using Revelle, 15 days on
site in Panama Basin with additional transit time from appropriate ports
(Panama, Puntarenas, even San Diego?)
(3) Data recovery cruise late in year 3, using ALVIN (also feasible with
JASON), 2 days on site in Panama Basin. Timing relatively flexible to fit
Atlantis schedule; sites convenient to Canal.
Times above are time on site; transit days need to be figured in!
Second and third cruises would probably involve one Central American port,
another port to be named, consistent with ship schedules.
Second cruise would also involve deployment of PGC heat flow probe on trawl
wire.
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
F. N. Spiess MPL/SIO/UCSD
C. De Moustier MPL/SIO/UCSD
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
===============================================================================
SCUBA Diving? _ No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical X 0.680" _ GPS _ Inmarsat
_ Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single X Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators _ Work boats
_ CTD _ Computer/peripherals
_ Rosette Sys. _ Auto Analyzer _ PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients _ Digital XBT
and number: _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
This form does not allow full entry of multi-cruise request.
We propose deployment of borehole instrumentation using MPL Control Vehicle.
3 cruises requested here:
(1) Test cruise early in year 2 using large DP-ship, 4 days on site off San
Diego
(2) Deployment cruise late in year 2, using large DP-ship, 15 days on site in
Panama Basin
(3) Data recovery cruise late in year 3, using ALVIN or JASON, 2 days on site
in Panama Basin
Times above are time on site; transit days need to be figured in!
Second and third cruises would probably involve one Central American port,
another port to be named, consistent with ship schedules.
Second cruise would also involve deployment of PGC heat flow probe on trawl
wire.
===============================================================================