=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 1998082010085199                                            
Version #:          003                                                         
Last Modified:      1999/02/25 09:52 EST                                        
Date Issued:        2010/07/31 14:10 EDT                                        
=============================================================================== 
P.I. Name    Last: Becker                   First: Keir               MI:       
=============================================================================== 
Institution: University of Miami - RSMAS        Research vessel required for:   
Address:     4600 Rickenbacker Causeway          _ Ancillary Only               
             Miami, FL 33149                     X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 305-361-4661    Fax: 305-361-4632    Email: kbecker@rsmas.miami.edu      
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
F. N. Spiess        MPL/SIO/UCSD        C. De Moustier      MPL/SIO/UCSD        
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Long-term monitoring of off-axis hydrogeology on the Costa Rica Rift using an   
instrumented wireline multi-packer system                                       
=============================================================================== 
Large Program Name: Other            Research Purpose: Instrumentation          
If Other, specify: ODP               If Other, specify:                         
=============================================================================== 
New Proposal? Y               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? N                NSF/OCE/ODP                                      
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                               $384,172                NP13                     
Agency Proposal #:                                                              
 OCE-9819316                                          Lat/Long:                 
Renewal? N                    Start Date: 4/1/99       Begin: 1N 84W            
Grant #:                      End Date:   3/31/02      End:   1N 84W            
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2000     Large                 4 on site   Apr/May/00        Jun/00             
2001     Roger Revelle         15 on site  Jan-Mar/01        see comments       
2002     Atlantis              2 on site   Jan-Mar/02        winter 01/02       
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 4/15/2                            Start:         Intermediate:  End:           
Number in Science Party:           see comments   see comments   see comments   
 12/15/4                                                                        
=============================================================================== 
Equipment Required:                                                             
_ Vans                       _ P-Code GPS    _ MCS   X Alvin    _ ABE           
X Dynamic Positioning        _ Multibeam     _ SCS   X ROV      X 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
1. Note this is a collaborative program with MPL/SIO group, who will have       
separate 2-year funding on OCE-9019780 (4/1/99-3/31/01).  The MPL group will be 
involved in the first two of our requested three cruises;  these first two      
cruises should therefore be scheduled respectively at beginning and end of      
second project year. The RSMAS/PGC group is involved in a related project with  
JOIDES Resolution that may be scheduled May-July, 2001, so scheduling the       
second year Revelle cruise later than March 2001 may not be possible.           
2. More details for multi-cruise request:                                       
The first two cruises involve the MPL Control Vehicle to test and then deploy   
long-term borehole instruments.  The third cruise is a data recovery effort     
about one-year after main deployment cruise, and is requested with ALVIN.       
3 cruises requested here:                                                       
(1) Test cruise off San Diego early in year 2 using large DP-ship, 4 days on    
site, start and end ports San Diego                                             
(2) Deployment cruise late in year 2, preferrably using Revelle, 15 days on     
site in Panama Basin with additional transit time from appropriate ports        
(Panama, Puntarenas, even San Diego?)                                           
(3) Data recovery cruise late in year 3, using ALVIN (also feasible with        
JASON), 2 days on site in Panama Basin.  Timing relatively flexible to fit      
Atlantis schedule; sites convenient to Canal.                                   
Times above are time on site; transit days need to be figured in!               
Second and third cruises would probably involve one Central American port,      
another port to be named, consistent with ship schedules.                       
Second cruise would also involve deployment of PGC heat flow probe on trawl     
wire.                                                                           
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
F. N. Spiess     MPL/SIO/UCSD                                                   
C. De Moustier   MPL/SIO/UCSD                                                   
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
                                                                                
=============================================================================== 
SCUBA Diving? _ No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? _ No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   _ Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   X 0.680"    _ GPS                  _ Inmarsat      
_ Hydro         _ 9/16"      _ 0.322"    _ DGPS                 _ ATS           
_ CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
_ Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
_ 12 kHz Echosounder       _ Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
_ CTD                                                 _ Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            _ PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
This form does not allow full entry of multi-cruise request.                    
We propose deployment of borehole instrumentation using MPL Control Vehicle.    
3 cruises requested here:                                                       
(1) Test cruise early in year 2 using large DP-ship, 4 days on site off San     
Diego                                                                           
(2) Deployment cruise late in year 2, using large DP-ship, 15 days on site in   
Panama Basin                                                                    
(3) Data recovery cruise late in year 3, using ALVIN or JASON, 2 days on site   
in Panama Basin                                                                 
Times above are time on site; transit days need to be figured in!               
Second and third cruises would probably involve one Central American port,      
another port to be named, consistent with ship schedules.                       
Second cruise would also involve deployment of PGC heat flow probe on trawl     
wire.                                                                           
=============================================================================== 

PDF/ASCII format to: