UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 1999061413335859
Version #: 004
Last Modified: 2002/05/01 08:41 EDT
Date Issued: 2009/11/22 02:09 EST
===============================================================================
P.I. Name Last: Weller First: Robert MI: A
===============================================================================
Institution: Woods Hole Oceanographic Research vessel required for:
Institution _ Ancillary Only
Address: Clark 204a MS 29 X Principal Use
Woods Hole, MA 02543 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 508 289 2508 Fax: 508 457 2163 Email: rweller@whoi.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
===============================================================================
Proposal Title:
---------------
Long Term Evolution and Coupling of the Boundary Layers in the Stratus Deck
Regions of the Eastern Pacific
===============================================================================
Large Program Name: Other Research Purpose: Multi-discipline
If Other, specify: Pan American If Other, specify: recover, redeploy
Climate Study air-sea flux mooring
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? Y
Funded Grant? N NOAA Chile
Institutional Proposal #: Amount Requested: Area(s) of Operation:
PO10980.1 $1,000K/yr SP3A
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 07/01/02 Begin: 20S, 85W
Grant #: End Date: 06/30/06 End: 20S, 74W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2002 Large 7 plus Oct 10-20 Oct 1-30
transit
2003 Large 7 plus Oct 10-120 Oct 1-30
transit
2004 Large 7 plus Oct 10-20 Oct 1-30
transit
2005 Large 7 plus Oct 10-20 Oct 1-30
transit
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
16/yr* Start: Intermediate: End:
Number in Science Party: Arica Arica
12
===============================================================================
Equipment Required:
X Vans X P-Code GPS _ MCS _ Alvin _ ABE
X Dynamic Positioning X Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
deploy deep ocean surface mooring; mooring winch, crane to lift surface buoy ;
over side needed; trawl winch as backup for dragging; IMET sensors on ship;
small boat
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
Dr. Chris NOAA/ETL 3034973253 Chris.Fairall@noaa.gov
Fairalll
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
Mooring has 1-year endurance due to battery life. It was first deployed in mid
October 2000, turned around mid-October 2001, and needs to be turned around
mid-October each year +/- 2 weeks leeway. 7 days science time are requested (6
days are neeeds working at 20S, 85W; 1 day is needed along the way to that site
for testing). Additional time is needed for transit; the transit the time time
depends on which port s are used and crusing speed. Have worked in and out of
Arica, Chile. As time permits sampling will be done on inbound leg into Arica,
Chile along 20S in collaboration with Chilean Navy hydrographic office (SHOA)
and collaegues at the Univ. of Concepcion, Chile. Occupying this line supports
Chilean research, builds collaboration, and helps with asking the Chilean Navy
to keep an eye on our mooring. Other ports canbe used for start. Of concern
are the lading and work facilities in the ports. 2 9,000 lb anchors, the
mooring winch, a 20' van loaded with glass balls and mooring line, the buoy
hull must be loaded and unloaded, requiring good shore cranes. Also needed is
aplace to work in port for about a week setting buoy up before start of cruise.
NOTE: ASTERISK ON TOTAL SHIP DAYS DENOTES MORE DAYS NEEDED IF PORTS OTHER THAN
ARICA USED. ARICA to ARICA CRUISE COULD BE DONE IN 14 DAYS. STARTING/ENDING
USING OTHER PORTS REQUIRES MORE DAYS. 16 DAYS/YR REQUESTED AGAINST ARICA NOT
BEING USED FOR START AND END. AS THIS IS NOAA FUNDED, SCHEDULING REQUIRES
COLLABORATION WITH NOAA SHIP SCHEDULING (NOW FRED ROSSMANN,
FREDERICK.W.ROSSMANN@NOAA.GOV).
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
X Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
Chilean observors, from SHOA, Chilean Navy Hydrographic and Oceanographic
Office and also Chilean scientists, probably from the Univ. of Cocncepcion,
Chile. If cruise originates in other country, foreign observors as required.
===============================================================================
Use of Hazardous Materials? X No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No X Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
X Dredge/Trawl Mechanical _ 0.680" X GPS X Inmarsat
X Hydro X 9/16" _ 0.322" _ DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran X FAX
X Capstans _ 1/4" _ Single X Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
X 12 kHz Echosounder X Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges X Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators X Work boats
_ CTD X Computer/peripherals
_ Rosette Sys. _ Auto Analyzer X PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients X Digital XBT
and number: _ Oxygen titration X ADCP
_ Liquid Scintillation _ Gravimeter
X Uncontaminated seawater X IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
Need mooring winch for deployment; can bring one from WHOI, but would be good
to have spare. Will use air tuggers and capstan during deployment/recovery off
mooring. Storgage van for glass balls. Will bring SeaBird CTD. Need IMET
system
freshly calibrated; need real time display (graphic) of shipboard met obs.
Work
boat maybe required for mooring deployment/recovery.
===============================================================================