=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 1999061413335859                                            
Version #:          004                                                         
Last Modified:      2002/05/01 08:41 EDT                                        
Date Issued:        2009/11/22 02:09 EST                                        
=============================================================================== 
P.I. Name    Last: Weller                   First: Robert             MI: A     
=============================================================================== 
Institution: Woods Hole Oceanographic           Research vessel required for:   
               Institution                       _ Ancillary Only               
Address:     Clark 204a MS 29                    X Principal Use                
             Woods Hole, MA 02543                _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 508 289 2508    Fax: 508 457 2163    Email: rweller@whoi.edu             
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
                                                                                
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Long Term Evolution and Coupling of the Boundary Layers in the Stratus Deck     
Regions of the Eastern Pacific                                                  
=============================================================================== 
Large Program Name: Other            Research Purpose: Multi-discipline         
If Other, specify: Pan American      If Other, specify: recover, redeploy       
                Climate Study                        air-sea flux mooring       
=============================================================================== 
New Proposal? Y               Agency Submitted to:    Foreign EEZ?  Y           
Funded Grant? N                NOAA                    Chile                    
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
 PO10980.1                     $1,000K/yr              SP3A                     
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date: 07/01/02     Begin: 20S, 85W          
Grant #:                      End Date:   06/30/06     End:   20S, 74W          
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2002     Large                 7 plus      Oct 10-20         Oct 1-30           
                                 transit                                        
2003     Large                 7 plus      Oct 10-120        Oct 1-30           
                                 transit                                        
2004     Large                 7 plus      Oct 10-20         Oct 1-30           
                                 transit                                        
2005     Large                 7 plus      Oct 10-20         Oct 1-30           
                                 transit                                        
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 16/yr*                            Start:         Intermediate:  End:           
Number in Science Party:           Arica                         Arica          
 12                                                                             
=============================================================================== 
Equipment Required:                                                             
X Vans                       X P-Code GPS    _ MCS   _ Alvin    _ ABE           
X Dynamic Positioning        X Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
deploy deep ocean surface mooring; mooring winch, crane to lift surface buoy ;  
over side needed; trawl winch as backup for dragging; IMET sensors on ship;     
small boat                                                                      
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Dr. Chris        NOAA/ETL               3034973253     Chris.Fairall@noaa.gov   
  Fairalll                                                                      
                                                                                
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
Mooring has 1-year endurance due to battery life.  It was first deployed in mid 
October 2000, turned around mid-October 2001, and needs to be turned around     
mid-October each year +/- 2 weeks leeway.  7 days science time are requested (6 
days are neeeds working at 20S, 85W; 1 day is needed along the way to that site 
for testing).  Additional time is needed for transit; the transit the time time 
depends on which port s are used and crusing speed.  Have worked in and out of  
Arica, Chile.  As time permits sampling will be done on inbound leg into Arica, 
Chile along 20S in collaboration with Chilean Navy hydrographic office (SHOA)   
and collaegues at the Univ. of Concepcion, Chile.  Occupying this line supports 
Chilean research, builds collaboration, and helps with asking the Chilean Navy  
to keep an eye on our mooring.  Other ports canbe used for start.  Of concern   
are the lading and work facilities in the ports.  2 9,000 lb anchors, the       
mooring winch, a 20' van loaded with glass balls and mooring line, the buoy     
hull must be loaded and unloaded, requiring good shore cranes.  Also needed is  
aplace to work in port for about a week setting buoy up before start of cruise. 
NOTE: ASTERISK ON TOTAL SHIP DAYS DENOTES MORE DAYS NEEDED IF PORTS OTHER THAN  
ARICA USED.  ARICA to ARICA CRUISE COULD BE DONE IN 14 DAYS.  STARTING/ENDING   
USING OTHER PORTS REQUIRES MORE DAYS.  16 DAYS/YR REQUESTED AGAINST ARICA NOT   
BEING USED FOR START AND END.  AS THIS IS NOAA FUNDED, SCHEDULING REQUIRES      
COLLABORATION WITH NOAA SHIP SCHEDULING (NOW FRED ROSSMANN,                     
FREDERICK.W.ROSSMANN@NOAA.GOV).                                                 
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
X Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
Chilean observors, from SHOA, Chilean Navy Hydrographic and Oceanographic       
Office and also Chilean scientists, probably from the Univ. of Cocncepcion,     
Chile.  If cruise originates in other country, foreign observors as required.   
=============================================================================== 
Use of Hazardous Materials? X No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   X Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
X Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  X Inmarsat      
X Hydro         X 9/16"      _ 0.322"    _ DGPS                 _ ATS           
_ CTD           _ 1/2"       _ .225"     _ Loran                X FAX           
X Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
X 12 kHz Echosounder       X Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             X Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            X Work boats              
_ CTD                                                 X Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            X PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                X Digital XBT             
  and number:              _ Oxygen titration         X ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           X Uncontaminated seawater  X IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
Need mooring winch for deployment; can bring one from WHOI, but would be good   
to have spare.  Will use air tuggers and capstan during deployment/recovery off 
mooring.  Storgage van for glass balls.  Will bring SeaBird CTD.  Need IMET     
system                                                                          
freshly calibrated; need real time display (graphic) of shipboard met obs.      
Work                                                                            
boat maybe required for mooring deployment/recovery.                            
=============================================================================== 

PDF/ASCII format to: