===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 1999081113562470
Version #: 016
Last Modified: 2005/07/18 18:10 EDT
Date Issued: 2010/02/09 20:18 EST
===============================================================================
P.I. Name Last: LASKE First: M. Gabriele MI:
===============================================================================
Institution: Scripps Inst. of Oceanography, Research vessel required for:
Univ. of Calif., San Diego _ Ancillary Only
Address: 9500 Gilman Drive X Principal Use
La Jolla, CA 92093-0225 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: (858) 534-8774 Fax: (858) 534-8090 Email: glaske@ucsd.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
John A. Orcutt Scripps Inst. of Jason Phipps Scripps
Oceanography Morgan Institution of
Oceanography
===============================================================================
Proposal Title:
---------------
Group Proposal: PLUME - A Seismic Experiment to Image the Hawaiian Hotspot and
Swell
===============================================================================
Large Program Name: WOCE Research Purpose: Marine Geophysics
If Other, specify: If Other, specify:
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? N
Funded Grant? N NSF/OCE/MGG
Institutional Proposal #: Amount Requested: Area(s) of Operation:
UCSD 20-1312 $434,012 NP11,NP12
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 03/01/03 Begin: 21/20N-157/55W
Grant #: End Date: 02/28/08 End: Same
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2005 Roger Revelle 17 Jan 2005 Mar 2005
2006 Roger Revelle 14 early Jan 2006 Mar 2006
2006 Roger Revelle 26 Apr 2006 May 2006
2007 Roger Revelle 26 Apr 2007 May 2007
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
94 Start: Intermediate: End:
Number in Science Party: Honolulu, HI Honolulu, HI
16
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning X Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
this shipform was updated may11,2003 upon approval of Dave Epp and Linda Goad;
we request 1 additional day in port prior to cruise and 3 additional days at
sea; for the first of the three proposed curises; we also need dredging
equipment for geochemical analysis though I don't know where to enter this
Amendment July 2005: requests for cruises 2 and 3 updated. This was originally
proposed
as one single cruise but we need to separate the recovery and redeployment of
OBSs. The split was approved by Dave Epp in December 2004. If the time window
between these cruises is 3 months, then the ideal end port for cruise 2 is San
Diego, or any port along the West Coast, to ship the instruments back to WHOI.
If the time between cruises is less, then the end port should be Honolulu so
that the instruments can be refurbished there. Then, ideally, the start of
cruise 3 should be where cruise 2 ended. Cruise 2 can
start as early as December 2005.
A Revelle/Melville size ship is needed. The Kilo Moana is not suitable for
cruise 2, because the recovery would required a zodiak to pick up the
instruments. This is dangerous and would require day-time recovery, which would
require additional days at sea. The KM is also impractible for cruise 3. We
need to have 4 full-size vans on board, together with 35 OBSs. One van operates
as Lab van and needs to be on the same level as all the OBSs. Access by an
operating crane is required to all 4 vans.
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
Sean Solomon Carnegie Institute of
Washington
Bob Detrick Woods Hole
Oceanographic
Institution
John Collins Woods Hole
Oceanographic
Institution
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
X Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
lead PI is German; Collins is Irish
===============================================================================
Use of Hazardous Materials? _ No X Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Lithium Batteries Quantity: 35 sets
Disposal Plan:
--------------
will be disposed by OBS teams, as is routinely done
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
X Dredge/Trawl Mechanical _ 0.680" X GPS X Inmarsat
X Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single _ Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
X 12 kHz Echosounder X Multibeam Sounder _ Air Compressor
X 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
X Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators _ Work boats
_ CTD X Computer/peripherals
_ Rosette Sys. _ Auto Analyzer _ PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients X Digital XBT
and number: _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
need deck space to place 4 full size vans plus 35 OBSs
===============================================================================