===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 1999081218400359
Version #: 001
Last Modified: 1999/08/12 18:40 EDT
Date Issued: 2009/11/23 02:14 EST
===============================================================================
P.I. Name Last: Hammond First: Douglas MI: E
===============================================================================
Institution: University of Southern California Research vessel required for:
Address: Dept. of Earth Sciences, _ Ancillary Only
University Park X Principal Use
Los Angeles, CA 90089-0740 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 213-740-5837 Fax: 213-740-8801 Email: dhammond@usc.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
James M. McManus U. Minn. Duluth
===============================================================================
Proposal Title:
---------------
Collaborative Studies (USC and UM): Fractionation of Ge and Si during
diagenesis, and its implications for regulating the oceanic Ge/Si ratio
===============================================================================
Large Program Name: None Research Purpose: Chemical Oceanography
If Other, specify: If Other, specify:
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? N
Funded Grant? N NSF/OCE/CO
Institutional Proposal #: Amount Requested: Area(s) of Operation:
187,295 NP9
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 1/1/00 Begin: 34N 118W
Grant #: End Date: 12/31/02 End: 33N 120W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2001 Point Sur 10 6/1/01 7/1/01
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
10 Start: Intermediate: End:
Number in Science Party: Los Angeles Los Angeles
10
===============================================================================
Equipment Required:
X Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Small cold van or cold room (50 ft2), Multi-corer
===============================================================================