===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 2000060719464475
Version #: 003
Last Modified: 2001/01/05 16:50 EST
Date Issued: 2009/11/22 09:17 EST
===============================================================================
P.I. Name Last: Garfield First: Newell MI:
===============================================================================
Institution: San Francisco State University Research vessel required for:
Address: P.O. Box 855 _ Ancillary Only
Tiburon, CA 94920-0855 X Principal Use
_ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 415-338-3713 Fax: 415-435-7120 Email: garfield@sfsu.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
John Largier SIO UCSD Richard Dugdale SFSU
===============================================================================
Proposal Title:
---------------
The Role of Wind-Driven Transport in Shelf Productivity
===============================================================================
Large Program Name: Other Research Purpose: Multi-discipline
If Other, specify: CoOP If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? N
Funded Grant? N NSF/OCE/PO
Institutional Proposal #: Amount Requested: Area(s) of Operation:
6.9 mil (all) NP9
Agency Proposal #:
Lat/Long:
Renewal? Y Start Date: 1/01/00 Begin: 37N 122 W
Grant #: End Date: 12/31/04 End: 39 N 124 W
OCE-9910896
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2001 Point Sur 30 5/18-6/18, upwelling, winter
11/3-16
2002 Point Sur 45 1/12-26, winter, upwelling
5/18-6/18
2003 Point Sur 14 1/12-26 winter
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
51 Start: Intermediate: End:
Number in Science Party: Moss Landing, San Francisco, Moss Landing,
12 CA CA CA
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Standard R/V Pt. Sur equipment plus a Scanfish sampling vehicle
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
John Largier SIO 858-534-6268 jlargier@ucsd.edu
Richard Dugdale SFSU 415-338-3518 rdugdale@sfsu.edu
Stephen Bollens SFSU 415-338-3512 sbollens@sfsu.edu
Raphe Kudela UCSC kura@mbari.org
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
The cruises need to be coordinated with Dever and Largier mooring cruises for
the same projects. This year we were supplied with the URI Scanfish. We feel
this equipment is essential for successful completion of the projects. The
timing of the cruises is a compromise between the spring upwelling period and
teaching schedules of most of the PIs.
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No X Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
All MSDS forms on file with Moss Landing Marine Labs
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
See above
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No X Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc): R/V always supplies Technician
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical _ 0.680" X GPS X Inmarsat
X Hydro X 9/16" X 0.322" _ DGPS _ ATS
X CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single _ Dynamic Positioning X Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
X 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine X Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab X Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear X Chest Freezers (Size):
_ Thermometers X Refrigerators _ Work boats
X CTD _ Computer/peripherals
X Rosette Sys. _ Auto Analyzer _ PC computers
X Niskin bottles _ Salinometer X SAIL system
Size: 10 l _ Nutrients _ Digital XBT
and number: 12 _ Oxygen titration X ADCP
X Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
Scanfish
===============================================================================