=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 2000080216202992                                            
Version #:          007                                                         
Last Modified:      2002/01/24 12:22 EST                                        
Date Issued:        2009/11/22 01:58 EST                                        
=============================================================================== 
P.I. Name    Last: Villareal                First: Tracy              MI: A     
=============================================================================== 
Institution: The University of Texas at Austin  Research vessel required for:   
Address:     750 Channel View Dr.                _ Ancillary Only               
             Port Aransas, TX  78373             X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 361-749-6732    Fax: 361-749-6777    Email: tracy@utmsi.utexas.edu       
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
McKay               Bowling Green       Pilskaln            Univ. Maine Orono   
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Collaborative Research: Rhizosolenia mats as a source of nitrogen flux into the 
surface waters of the Pacific ocean:   Fe stress, N excretion and basin scale   
distribution patterns                                                           
=============================================================================== 
Large Program Name: None             Research Purpose: Biological Oceanography  
If Other, specify:                   If Other, specify:                         
=============================================================================== 
New Proposal? Y               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? N                NSF/OCE/BIO                                      
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                               324,519                 NP8                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date: 03/15/01     Begin: 20 N 159 W        
Grant #:                      End Date:   05/14/04     End:   20 N 159 W        
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2002     Large                 25          Aug 02            July 02            
2003     Large                 25          Aug. 03           July 03            
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 42                                Start:         Intermediate:  End:           
Number in Science Party:           HI                            HI or CA       
 15                                                                             
=============================================================================== 
Equipment Required:                                                             
_ Vans                       _ P-Code GPS    _ MCS   _ Alvin    _ ABE           
_ Dynamic Positioning        _ Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
Blue water diving is required for this work. We will need a compressor and host 
instituion diving suppport.  Scripps vessels have supported my work very well   
in this regard in the past. They can provide both a compressor and dive board   
representative (resident technician) that can assist with the diving program.   
I require a vessel with adequate space to lay out and support our 2 ROV systems 
in addition to the required deckspace for diving work boats and deckboard       
incubators. The ROV operations requires dynamic station keeping ability.        
Previous work has been compromised by the wind drift that was a substantial     
fraction of the ROV’s lateral speed.  This severely compromises the depth to    
which the ROV can operate and restricts the horizontal survey to less than our  
minimum need. I will require CTD/rosette support including fluorescence and PAR 
data.  Different transects are required in the two years. One will be from HI   
east towards the mainland, the other from HI west to about 175 W and then back  
to port. It does not matter which transect occurs in which year.                
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
McKay            Bowling Green                                                  
Pilskaln         Univ. Maine Orono                                              
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
The cruise in the summer of 2003 has time constraints.  The cruise cannot begin 
earlier than mid-July.                                                          
=============================================================================== 
SCUBA Diving? _ No   X Yes -- Designate Lead Institution: R. V. host            
                                                            institution         
# Individual dives: 30                  # Divers on board:  6                   
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? X No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type: chemicals                 Quantity: 1-2 kg, 4-8 L           
Disposal Plan:                                                                  
--------------                                                                  
All chemical wastes generated aboard the vessel will be maintained in hazardous 
waste containers and removed at the end of the cruise.                          
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   X Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc): CTC                                   
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  X Inmarsat      
X Hydro         _ 9/16"      _ 0.322"    _ DGPS                 _ ATS           
X CTD           _ 1/2"       _ .225"     _ Loran                X FAX           
_ Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
_ 12 kHz Echosounder       _ Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  X Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 X MOCNESS                 
_ Explosive Handling Gear  X Chest Freezers             (Size): 1 m             
_ Thermometers             X Refrigerators            X Work boats              
X CTD                                                 X Computer/peripherals    
X Rosette Sys.             _ Auto Analyzer            X PC computers            
X Niskin bottles           _ Salinometer              X SAIL system             
  Size: 10-12 L            _ Nutrients                _ Digital XBT             
  and number: 10-12        _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           X Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
Blue water diving is required for this work. We will need a compressor and host 
institution diving suppport.  Scripps vessels have supported my work very well  
in this regard in the past. They can provide both a compressor and dive board   
representative (resident technician) that can assist with the diving program.   
I require a vessel with adequate space to lay out and support our 2 ROV systems 
in addition to the required deckspace for diving work boats and deckboard       
incubators. The ROV operations requires dynamic station keeping ability.        
Previous work has been compromised by the wind drift that was a substantial     
fraction of the ROV’s lateral speed.  This severely compromises the depth to    
which the ROV can operate and restricts the horizontal survey to less than our  
minimum need. I will require CTD/rosette support including fluorescence and PAR 
data.  Different transects are required in the two years. One will be from HI   
east towards the mainland, the other from HI west to about 175 W and then back  
to port. It does not matter which transect occurs in which year.                
	I will be providing a 1/4 MOCNESS system.  We will need a 1 m MOCNESS system   
if it can be provided.  Winch/conducting cable arrangements should include the  
capability of towing both systems.  Nutrient analysis is needed  both deep      
(>1000 m) and shallow casts.  This will include nitrate+ nitrite, phosphate and 
silicate.  We will be conducting 5-7 midwater trawls for myctophid fish.        
	Pilskaln  needs the hydrowire for the VPR,  and a hydroweight of some sort to  
hang                                                                            
below the VPR to balance it; we need the  crane for the ROV. The tether length  
limits our operating depth; therefore the pilot and support equipment needs to  
be as close as possible to where the tether will go over the side.  As for our  
power requirements, we need 208 vac, 3-phase at 10 kw for the                   
ROV.                                                                            
	 We will need deckspace for circulating water incubators.                      
=============================================================================== 

PDF/ASCII format to: