=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 2001081317531148                                            
Version #:          003                                                         
Last Modified:      2003/06/24 16:29 EDT                                        
Date Issued:        2010/09/05 21:16 EDT                                        
=============================================================================== 
P.I. Name    Last: Holbrook                 First: W. Steven          MI:       
=============================================================================== 
Institution: University of Wyoming              Research vessel required for:   
Address:     Dept. of Geology and Geophysics     _ Ancillary Only               
             Laramie, WY 82071-3006              X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 307 766 2427    Fax: 307 766 6679    Email: steveh@uwyo.edu              
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Charles Paull       MBARI               Bill Ussler         MBARI               
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Methane release in submarine landslides: A seismic, sedimentological,           
and geochemical study of the Storegga slide, offshore Norway                    
=============================================================================== 
Large Program Name: None             Research Purpose: Marine Geophysics        
If Other, specify:                   If Other, specify: also marine geology     
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  Y           
Funded Grant? Y                NSF/OCE/ODP             Norway                   
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                               $598,993                NA5                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date: 04/01/03     Begin: 63N 6E            
Grant #:                      End Date:   03/31/06     End:   68N 6W            
 OCE0221366                                                                     
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2003     Maurice Ewing         39          July-August                          
2004     Knorr                 10          July-August                          
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 43                                Start:         Intermediate:  End:           
Number in Science Party:           Stavanger                     Stavanger      
 15                                                                             
=============================================================================== 
Equipment Required:                                                             
X Vans                       X P-Code GPS    X MCS   _ Alvin    _ ABE           
_ Dynamic Positioning        X Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
This program will require 8 days of Jumbo Piston Coring (plus 2 weather days),  
and space on deck for the MBARI geochemical van.                                
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Charles Paull    MBARI                  831-775-1886   paull@mbari.org          
Bill Ussler      MBARI                                                          
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
This up-date is to reflect the cruise being split into 2 legs, one in 2003 for  
the MCS work and the other in 2004 dedicated to the Jumbo coring efforts.       
=============================================================================== 
SCUBA Diving? _ No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? _ No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   _ Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
X Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  _ Inmarsat      
_ Hydro         X 9/16"      _ 0.322"    X DGPS                 _ ATS           
_ CTD           X 1/2"       _ .225"     _ Loran                _ FAX           
_ Capstans      _ 1/4"       _ Single    _ Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
_ 12 kHz Echosounder       X Multibeam Sounder        _ Air Compressor          
X 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
X Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
_ CTD                                                 _ Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            _ PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
The second trip of this program will require 8 days of Jumbo Piston Coring.     
With two weather contingency days, 10 science days are requested.   Our         
operations area is about 2 days transit from Stalvanger.  Thus, a 14 day cruise 
is requested. The cores will be collected by one of the NSF supported coring    
groups (presumably the WHOI group).  Space on deck for the MBARI geochemical    
van is needed. The van requires 10 kw of 208 volt 3-phase electricity.          
=============================================================================== 

PDF/ASCII format to: