===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20021021100706HN
Version #: 006
Last Modified: 2005/12/15 13:52 EST
Date Issued: 2010/02/09 20:09 EST
===============================================================================
P.I. Name Last: Gaherty First: James MI: B
===============================================================================
Institution: Lamont Doherty Earth Observatory Research vessel required for:
Address: 61 Rt 9W _ Ancillary Only
Palisades, NY 10964 X Principal Use
_ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 845-365-8450 Fax: 845-365-8150 Email: gaherty@eas.gatech.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
John Collins Woods Hole
Oceanographic
Institute
===============================================================================
Proposal Title:
---------------
Collaborative Research: Upper Mantle Structure Beneath the Gulf of California
===============================================================================
Large Program Name: Other Research Purpose: Marine Geophysics
If Other, specify: MARGINS If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? Y
Funded Grant? Y NSF/OCE/MGG Mexico
Institutional Proposal #: Amount Requested: Area(s) of Operation:
314,170 NP13
Agency Proposal #:
0305454 Lat/Long:
Renewal? N Start Date: 01/01/2004 Begin: 23N 252E
Grant #: End Date: 01/01/2007 End: 30N 246E
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2005 Medium 7 10/01/2005 01/01/2006
2006 New Horizon 7 11/01/2006 10/15/2006
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
15 Start: Intermediate: End:
Number in Science Party: San Diego San Diego
10
===============================================================================
Equipment Required:
_ Vans X P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Moved up 3 months because of changes to broadband seismometer design. Power in
seismometers will fail after approx. 1 year, rather than 15 months as
originally estimated. Picking up 12 months from the Oct 05 deployment will
minimize possible data loss.
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
John Collins Woods Hole
Oceanographic
Institute
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
Schedule in conjunction with OBSIP
===============================================================================
SCUBA Diving? _ No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical _ 0.680" X GPS _ Inmarsat
_ Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single _ Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
X 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators _ Work boats
_ CTD X Computer/peripherals
_ Rosette Sys. _ Auto Analyzer X PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients _ Digital XBT
and number: _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
===============================================================================