UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20021029134956FG
Version #: 003
Last Modified: 2002/11/04 12:53 EST
Date Issued: 2009/11/22 23:41 EST
===============================================================================
P.I. Name Last: Gargett First: Ann MI: E
===============================================================================
Institution: Old Dominion University Research vessel required for:
Address: Dept. of Ocean, Earth and _ Ancillary Only
Atmospheric Science X Principal Use
ODU, Norfolk, Virginia 23529 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 757-683-6009 Fax: 757-683-5550 Email: gargett@ccpo.odu.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
Craig Woolsey Virginia Tech
===============================================================================
Proposal Title:
---------------
Collaborative research: A two-body towing system for swath-mapping ocean
turbulence
===============================================================================
Large Program Name: None Research Purpose: Instrumentation
If Other, specify: If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? N
Funded Grant? Y NSF/OCE/OTIC
Institutional Proposal #: Amount Requested: Area(s) of Operation:
322571 353,235 NA6
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 08/15/02 Begin: 38N,74W
Grant #: End Date: 07/31/05 End: 40N,72W
OCE-0220504
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2004 Cape Hatteras 5 08/17/04 09/06/04
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
7 Start: Intermediate: End:
Number in Science Party: Norfolk, VA Norfolk, VA
6
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
dates are not crucial within mid-August to mid-September,2004; 1 day required
for transit;1 day for loading,could load/unload in vessel home port if
required; could use Cape Henlopen if Hatteras not available.
===============================================================================