===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20030213173206ID
Version #: 007
Last Modified: 2004/04/26 09:47 EDT
Date Issued: 2009/11/22 13:07 EST
===============================================================================
P.I. Name Last: McGillicuddy First: Dennis MI: J
===============================================================================
Institution: Woods Hole Oceanographic Research vessel required for:
Institution _ Ancillary Only
Address: 98 Water Street X Principal Use
Woods Hole, MA 02543 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 508-289-2683 Fax: 508-457-2194 Email: dmcgillicuddy@whoi.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
K.O. Buesseler Woods Hole J.R. Ledwell Woods Hole
Oceanographic Oceanographic
Inst. Inst.
===============================================================================
Proposal Title:
---------------
Collaborative Research: Impacts of Eddies and Mixing on Plankton Community
Structure and Biogeochemical Cycling in the Sargasso Sea
===============================================================================
Large Program Name: None Research Purpose: Multi-discipline
If Other, specify: If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? Y
Funded Grant? Y NSF/OCE/MGG Bermuda
Institutional Proposal #: Amount Requested: Area(s) of Operation:
OE10953.01 $1,837,260 NA6
Agency Proposal #:
0241310 Lat/Long:
Renewal? N Start Date: Begin:
Grant #: End Date: End:
OCE0241310
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2005 Knorr 25 6/1/2005 6/15/2005
2005 Weatherbird II 10 6/13/2005 6/27/2005
2005 Knorr 25 7/16/2005 7/30/2005
2005 Weatherbird II 10 7/28/2005 8/11/2005
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
70 Start: Intermediate: End:
Number in Science Party: Woods Hole Woods Hole
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Additional WHOI PI: W.J. Jenkins
PI's from other institutions SECTION 2;
Also, D. Steinberg, Virgina Institute of Marine Science
DETAIL OF 2005 SHIP TIME NEEDED - Timing of cruises must be coordinated. Note
that Knorr Surveys 1 and 2 are ideally scheduled 3-4 weeks apart. Weatherbird
work should overlap last 10 days of Knorr surveys (actual time on-site, not
including Knorr transit time).
2005 Knorr (Survey 1). 25 days Optimum 6/1/05-6/25/05
Sci Party = 28
2005 Weatherbird II. 10 days Optimum 6/13/05-6/22/05
Two-ship operation to run same time as Knorr survey 1
Sci Party = 10
2005 Knorr (Survey 2). 25 days Optimum 7/16/05-8/9/05
Sci Party = 28
2005 Weatherbird II. 10 days Optimum 7/28/05-8/6/05
Two-ship operation to run same time as Knorr survey 2
Sci Party = 10
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
N. Bates BBSR
D. Hansell RSMAS
D. Siegel UCSB
P. Falkowski Rutgers
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
Timing of cruises must be coordinated. Note that Knorr Surveys 1 and 2 are
ideally scheduled 3-4 weeks apart. Weatherbird work should overlap last 10 days
of Knorr surveys (actual time on-site, not including Knorr transit time).
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical _ 0.680" _ GPS _ Inmarsat
_ Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single _ Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators _ Work boats
_ CTD _ Computer/peripherals
_ Rosette Sys. _ Auto Analyzer _ PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients _ Digital XBT
and number: _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
===============================================================================