=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20030706170554ON                                            
Version #:          003                                                         
Last Modified:      2003/09/16 21:02 EDT                                        
Date Issued:        2010/02/09 20:26 EST                                        
=============================================================================== 
P.I. Name    Last: Bowen                    First: John               MI: D     
=============================================================================== 
Institution: ONR                                Research vessel required for:   
Address:     800 North Quincy Street             _ Ancillary Only               
             Arlington, VA  22217-5660           X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 703-696-2161    Fax: 703-696-2710    Email: john_bowen@onr.navy.mil      
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Dr. Larry Green     ONR                 Mr. Lee Shores      Marine Acoustics,   
                                                              Inc.              
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Multistatics on Sonabuoy Range                                                  
=============================================================================== 
Large Program Name: None             Research Purpose: Other                    
If Other, specify:                   If Other, specify: Future Naval            
                                                     Capabilities RDT&E         
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? Y                ONR                                              
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                                                       NP9                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date:              Begin: 33N 118W          
Grant #:                      End Date:                End:   33N 118W          
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2004     Robert Gordon Sproul  4           02/3/04-2/7/04                       
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 4 & 7                             Start:         Intermediate:  End:           
Number in Science Party:           2/1/04                        2/7/04         
 10-15                                                                          
=============================================================================== 
Equipment Required:                                                             
_ Vans                       _ P-Code GPS    _ MCS   _ Alvin    _ ABE           
_ Dynamic Positioning        _ Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
Overside deployment of hardware and functional check out that retreival.  Need  
25-30 ft of usable back deck space.  2 days mobilization, 1 day demobilization. 
Assumed 2 day transit both ways.  Operations on San Clemente Sonobuoy Range     
2/3-2/6/04.                                                                     
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Dr. Dave         ONR                                                            
  Armstrong                                                                     
Mr. Lee Shores   Marine Acoustics, Inc.                                         
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
                                                                                
=============================================================================== 
SCUBA Diving? _ No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? _ No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   _ Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   _ 0.680"    _ GPS                  _ Inmarsat      
_ Hydro         _ 9/16"      _ 0.322"    _ DGPS                 _ ATS           
_ CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
_ Capstans      _ 1/4"       _ Single    _ Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
_ 12 kHz Echosounder       _ Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
_ CTD                                                 _ Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            _ PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
Overside deployment of hardware and functional check out that retreival.  Need  
25-30 ft of usable back deck space.  2 days mobilization, 1 day demobilization. 
Assumed 2 day transit both ways.  Operations on San Clemente Sonobuoy Range     
2/4-8/04.  Anticipate daylight operations only, retunr to pier for evenings.    
=============================================================================== 

PDF/ASCII format to: