===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20040112233342SJ
Version #: 012
Last Modified: 2007/10/16 12:18 EDT
Date Issued: 2009/11/21 03:56 EST
===============================================================================
P.I. Name Last: Ohman First: Mark MI: D
===============================================================================
Institution: Scripps Institution of Research vessel required for:
Oceanography _ Ancillary Only
Address: U.C.S. D. X Principal Use
La Jolla, CA 92093-0218 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 858-534-2754 Fax: 858-822-0562 Email: mohman@ucsd.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
===============================================================================
Proposal Title:
---------------
LTER: Nonlinear Transitions in the California Current Coastal Pelagic
Ecosystem
===============================================================================
Large Program Name: LTER Research Purpose: Multi-discipline
If Other, specify: If Other, specify:
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? N
Funded Grant? N NSF/OCE/BIO
Institutional Proposal #: Amount Requested: Area(s) of Operation:
UCSD 20041492 $4.92 million NP9
Agency Proposal #:
OCE-0417616 Lat/Long:
Renewal? N Start Date: 09/01/04 Begin: 33N 117W
Grant #: End Date: 08/31/10 End: 33N 117W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2006 Roger Revelle 30 05/08/06
2007 Roger Revelle 20 04/01/07
2008 Roger Revelle 30 09/15/08 10/15/08
2005 New Horizon 4 tbd (see below)
2006 New Horizon 4 tbd (see below)
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
104 Start: Intermediate: End:
Number in Science Party: San Diego San Diego
32 (Revelle)
===============================================================================
Equipment Required:
X Vans X P-Code GPS _ MCS _ Alvin _ ABE
X Dynamic Positioning _ Multibeam _ SCS _ ROV X 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Cruise in Fall 2008 needs to be in the thermally stratified season (Sept-Oct).
This stratified season cruise will be of 30 days duration, as originally
planned. Fall stratified season cruise moved from fall 2007 to fall 2008 in
Oct. 2006, when spring 2007 El Nino cruise was scheduled.
Total of 24 days on the New Horizon; 4 days in each of 6 years (2005, 2006,
2007, 2008, 2009, 2010) to be scheduled with CalCOFI cruises. N.B. The present
ship request lists New Horizon time only for 2005 and 2006. See subsequent
form for New Horizon time in 2007-2010.
1 m^2 MOCNESS with full sensors needed for each Revelle cruise. VPR2, isotope
van, high speed internet, and berthing for 33 scientists also needed for each
Revelle cruise. Other special equipment to be determined.
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
===============================================================================
SCUBA Diving? _ No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
X Dredge/Trawl Mechanical X 0.680" X GPS X Inmarsat
X Hydro X 9/16" X 0.322" _ DGPS _ ATS
X CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single X Dynamic Positioning _ Cellular
_ Multi _ Other X SEANET
-------------------------------------------------------------------------------
X 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers X Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing X MOCNESS
_ Explosive Handling Gear X Chest Freezers (Size):
_ Thermometers X Refrigerators _ Work boats
X CTD X Computer/peripherals
X Rosette Sys. _ Auto Analyzer X PC computers
X Niskin bottles _ Salinometer X SAIL system
Size: _ Nutrients _ Digital XBT
and number: _ Oxygen titration X ADCP
_ Liquid Scintillation _ Gravimeter
X Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
Total of 24 days on the New Horizon; 4 days in each of 6 years (2005, 2006,
2007, 2008, 2009, 2010)to be scheduled with CalCOFI cruises.
1 m^2 double MOCNESS with full sensors and VPR2 needed for each Revelle cruise.
Other special equipment to be determined.
===============================================================================