=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20040204230632IE                                            
Version #:          002                                                         
Last Modified:      2004/02/10 13:27 EST                                        
Date Issued:        2009/11/22 02:03 EST                                        
=============================================================================== 
P.I. Name    Last: Yogodzinski              First: Gene               MI:       
=============================================================================== 
Institution: University of South Carolina       Research vessel required for:   
Address:     Dept of Geological Sciences, 701    _ Ancillary Only               
               Sumter Street, EWS Room 617       X Principal Use                
             Columbia, SC 29208                  _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 803-777-9524    Fax: 803-777-6610    Email: gyogodzin@geol.sc.edu        
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Peter Kelemen       Woods Hole          David Scholl        Moss Landing        
                      Oceanographic                           Marine Lab        
                      Inst                                                      
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Primitive Plutonism in an Island Arc:  A Study of Deep Submarine Canyons in the 
Western Aleutians                                                               
=============================================================================== 
Large Program Name: None             Research Purpose: Geological Oceanography  
If Other, specify:                   If Other, specify:                         
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? Y                NOAA/NURP                                        
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                               218,038                 NP5                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date: 06/01/04     Begin: 51.5N 177W        
Grant #:                      End Date:   05/31/06     End:   51.5N 177W        
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2004     Roger Revelle         3           07/24/04-08/1/04                     
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 3                                 Start:         Intermediate:  End:           
Number in Science Party:           Dutch Harbor                  Honolulu       
 5                                                                              
=============================================================================== 
Equipment Required:                                                             
_ Vans                       X P-Code GPS    _ MCS   _ Alvin    _ ABE           
X Dynamic Positioning        X Multibeam     _ SCS   X ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
multibeam, ROV JASON II, space for examination and storage of rock samples,     
rock cutting & crushing equipment                                               
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Peter Kelemen    Woods Hole             508-289-2956   pkelemen@whoi.edu        
                   Oceanographic Inst.                                          
David Scholl     Moss Landing Marine    650-329-4762   dscholl@usgs.gov         
                   Laboratory                                                   
Brad Singer      University of          (608) 265-8650 bsinger@geology.wisc.edu 
                   Wisconsin              (608)          bsinger@               
                                          265-8650       geology.wisc.edu       
                                          608-265-8650                          
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
Cruise is already scheduled.                                                    
Operations will include multibeam survey of Adak Canyon, ROV JASON II dives.    
Rock samples will be collected during the dives.                                
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? X No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   X Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc): multibeam                             
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
X Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  X Inmarsat      
_ Hydro         _ 9/16"      _ 0.322"    _ DGPS                 _ ATS           
_ CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
_ Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
_ 12 kHz Echosounder       X Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
_ CTD                                                 _ Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            _ PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
We will need multibeam, ROV JASON II, space for examination and storage of rock 
samples.  Also would like access to rock cutting and crushing equipment if      
possible.                                                                       
=============================================================================== 

PDF/ASCII format to: