===============================================================================
UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20040204232749BT
Version #: 001
Last Modified: 2004/02/04 23:27 EST
Date Issued: 2010/02/09 19:27 EST
===============================================================================
P.I. Name Last: Rathburn First: Anthony MI: E
===============================================================================
Institution: Indiana State University Research vessel required for:
Address: Dept of Geography, Geology, and _ Ancillary Only
Anthropology, Science Building X Principal Use
159 _ No Ship Required
Terre Haute, IN 47809 _ Long Range Planning Document
===============================================================================
Phone: 812-237-2269 Fax: 812-237-8029 Email: gerathbu@scifac.indstate.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
Lisa Levin Scripps Inst of Joris Gieskes Scripps Inst of
Oceanography Oceanography
===============================================================================
Proposal Title:
---------------
Biological Response to Catastrophic Disturbance on the Aleutian Margin, Gulf of
Alaska
===============================================================================
Large Program Name: None Research Purpose: Biological Oceanography
If Other, specify: If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? N
Funded Grant? Y NOAA/NURP
Institutional Proposal #: Amount Requested: Area(s) of Operation:
193,552 NP5
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 06/01/04 Begin: 53.5N 164.3W
Grant #: End Date: 05/31/04 End: 53.5N 163.2W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2004 Roger Revelle 6.5 07/10/04-07/24/04
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
10 Start: Intermediate: End:
Number in Science Party: Dutch Harbor Dutch Harbor
19
===============================================================================
Equipment Required:
_ Vans X P-Code GPS _ MCS _ Alvin _ ABE
X Dynamic Positioning X Multibeam _ SCS X ROV X 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Operations: multibeam, ROV JASON II, WHOI TowCam, gravity coring and box
coring. For biological and sediment sample processing, we will need wet lab
space, a cold room, -80 freezer, running seawater, fume hood.
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
Lisa Levin Scripps Inst of 858-534-3579 llevin@ucsd.edu
Oceanography
Joris Gieskes Scripps Inst of 858-534-4257 jgieskes@ucsd.edu
Oceanography
Jon Martin Univ of Florida 352-392-6219 jmartin@geology.ufl.edu
Gerard Fryer Univ of Hawaii 808-956-3188 gerard@hawaii.edu
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
Cruise is already scheduled.
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
_ Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
===============================================================================
Use of Hazardous Materials? _ No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No X Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc): multibeam, coring operations, TowCam
launch/recovery
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
X Dredge/Trawl Mechanical X 0.680" X GPS X Inmarsat
X Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
X CTD _ 1/2" _ .225" _ Loran _ FAX
_ Capstans _ 1/4" _ Single X Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder X Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
X Pingers _ Refrigerated _ Dip net
X Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
X Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
_ Thermometers _ Refrigerators _ Work boats
_ CTD _ Computer/peripherals
_ Rosette Sys. _ Auto Analyzer _ PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: _ Nutrients _ Digital XBT
and number: _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
X Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
Operations will include: multibeam survey, ROV JASON II, WHOI TowCam, gravity
coring and box coring. For biological and sediment sample processing, we will
need wet lab space, a cold room, -80 freezer, running seawater, fume hood.
Deck space will be needed for both ROV JASON II and TowCam. Biology and
sediment samples may need to be stored onboard until the ship returns to San
Diego.
===============================================================================