=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20040618162432IY                                            
Version #:          004                                                         
Last Modified:      2006/05/10 14:05 EDT                                        
Date Issued:        2010/02/09 19:47 EST                                        
=============================================================================== 
P.I. Name    Last: McArthur                 First: Shannon            MI: C     
=============================================================================== 
Institution: NOAA / NWS / National Data Buoy    Research vessel required for:   
               Center                            _ Ancillary Only               
Address:     Building 3203                       X Principal Use                
             Stennis Space Center, MS 39529      _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: (228) 688-2830  Fax: (228) 688-2869  Email: shannon.mcarthur@noaa.gov    
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
                                                                                
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
The DART Project is an ongoing effort to maintain and improve the capability    
for the early                                                                   
detection and real-time reporting of tsunamis in the open ocean.                
Oerated by NOAA's National Data Buoy Center (NDBC), DART is essential to        
fulfilling NOAA's national responsibility for tsunami hazard mitigation         
and warnings.                                                                   
Project goals are the:                                                          
Reduction in the loss of life and property in U.S. coastal communities.         
Elimination of false alarms which result in high economic costs for             
unnecessary evacuations.                                                        
DART stations have been sited in regions with a history of generating           
destructive tsunamis to ensure early detection of tsunamis and to acquire       
data critical to real-time forecasts.                                           
=============================================================================== 
Large Program Name: None             Research Purpose: Other                    
If Other, specify: Deep-ocean        If Other, specify: Tsunami Warning System  
                Assessment and                                                  
                Reporting of                                                    
                Tsunamis (DART)                                                 
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  Y           
Funded Grant? Y                NOAA                    Japan, Micronesia        
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                                                       NP10                     
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date:              Begin:                   
Grant #:                      End Date:                End:                     
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
                                                                                
2006     Melville              37          June 2006         November/December  
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 37                                Start:         Intermediate:  End:           
Number in Science Party:           Hawaii         Guam                          
 6                                                                              
=============================================================================== 
Equipment Required:                                                             
_ Vans                       _ P-Code GPS    _ MCS   _ Alvin    _ ABE           
X Dynamic Positioning        X Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
                                                                                
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
Special consideration is needed for the operational time-frame to conduct       
safe buoy exchanges.  Special consideration is also requested due to the        
operational life cycle of these buoys.                                          
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
X Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
Potential exist that NDBC will be training non-US technician on the servicing   
aspects of our systems.  Training is TBD.                                       
=============================================================================== 
Use of Hazardous Materials? X No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity: TBD                     
Disposal Plan:                                                                  
--------------                                                                  
Significant quanties of "D" Cell alkaline battery pucks                         
be utilized on this cruise.  Precautionary measures will be                     
taken to store and isolate these exhausted batteries upon                       
removal from the buoys.  The battery pucks will be returned                     
to the NDBC post cruise where they will be properly disposed.                   
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   X Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc): Yes: Multibeam Sounder                
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  _ Inmarsat      
_ Hydro         X 9/16"      _ 0.322"    _ DGPS                 _ ATS           
_ CTD           X 1/2"       _ .225"     _ Loran                _ FAX           
X Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
X 12 kHz Echosounder       X Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             X Storage                  _ Mid-water trawl         
X Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
_ CTD                                                 X Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            X PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
Previously provided system station locations to ship schedulers.                
                                                                                
For detailed information on the DART buoy systems visit                         
http://www.ndbc.noaa.gov/Dart/dart.shtml                                        
=============================================================================== 

PDF/ASCII format to: