=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20040623175131OK                                            
Version #:          004                                                         
Last Modified:      2006/09/22 13:03 EDT                                        
Date Issued:        2009/11/23 01:18 EST                                        
=============================================================================== 
P.I. Name    Last: Sanford                  First: Thomas             MI: B.    
=============================================================================== 
Institution: Applied Physics Laboratory, Univ.  Research vessel required for:   
               of Washington                     _ Ancillary Only               
Address:     1013 NE 40th Street                 X Principal Use                
             Seattle, WA 98105                   _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 206 543-1365    Fax: 206 543-6785    Email: sanford@apl.washington.edu   
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Douglas Luther      U. of Hawaii                                                
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Observing Integrating Ocean Variables                                           
=============================================================================== 
Large Program Name: None             Research Purpose: Instrumentation          
If Other, specify:                   If Other, specify:                         
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? Y                NSF/OCE/OTIC                                     
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                               880,848                 NP9                      
Agency Proposal #:                                                              
 0355043                                              Lat/Long:                 
Renewal? N                    Start Date: 04/01/04     Begin:                   
Grant #:                      End Date:   03/31/08     End:                     
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2007     Wecoma                4           01/15/07 deploy 3 flexible           
                                             HPIES                              
2007     Medium                3           04/15/07 check    flexible           
                                             performance,                       
                                             repair/r'dply                      
                                             if nec.                            
2007     Medium                4           07/15/07 r'cvr 1, flexible           
                                             r'dply 1, check                    
                                             performance                        
2007     Medium                3           10/15/07 check    flexible           
                                             performance,                       
                                             repair/r'dply                      
                                             if nec.                            
2008     Wecoma                5           01/15/08 recover  flexible           
                                             all units                          
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 19                                Start:         Intermediate:  End:           
Number in Science Party:           Newport OR                    Newport OR     
 5                                                                              
=============================================================================== 
Equipment Required:                                                             
_ Vans                       X P-Code GPS    _ MCS   _ Alvin    _ ABE           
_ Dynamic Positioning        _ Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
                                                                                
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Doug Luther      U. Hawaii              808 956-5875   dluther@soest.hawaii.edu 
                                                                                
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
This revised STR has been approved by NSF (A. Isern and L. Goad) and assumes    
that a combination of R/V Wecoma and R/V Pt. Sur can cover the requests.  I     
prefer the Wecoma for the Jan 07 and Jan 08 cruise because it is a bit larger   
and our project marine tech is very familiar with the vessel.  However, we      
would be glad for the use of either vessel or combination for any cruise.       
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? X No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   _ Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
X Dredge/Trawl  Mechanical   _ 0.680"    _ GPS                  X Inmarsat      
X Hydro         _ 9/16"      X 0.322"    X DGPS                 _ ATS           
X CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
X Capstans      _ 1/4"       _ Single    _ Dynamic Positioning  X Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
X 12 kHz Echosounder       _ Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
X Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
X CTD                                                 X Computer/peripherals    
X Rosette Sys.             _ Auto Analyzer            X PC computers            
X Niskin bottles           _ Salinometer              X SAIL system             
  Size: 10 L               _ Nutrients                X Digital XBT             
  and number: 12           _ Oxygen titration         X ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
                                                                                
=============================================================================== 

PDF/ASCII format to: