UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20041206130604VB
Version #: 001
Last Modified: 2004/12/06 13:06 EST
Date Issued: 2009/11/23 00:46 EST
===============================================================================
P.I. Name Last: Ramp First: Steven MI: R
===============================================================================
Institution: Naval Postgraduate School Research vessel required for:
Address: 833 Dyer Road _ Ancillary Only
Monterey, CA 93943 X Principal Use
_ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 831 656 2201 Fax: 831 656 2712 Email: sramp@nps.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
Naomi Leonard Princeton Henrik Schmidt MIT
===============================================================================
Proposal Title:
---------------
MURI/The Adaptive Sampling and Prediction (ASAP) System
===============================================================================
Large Program Name: Other Research Purpose: Multi-discipline
If Other, specify: Multi-University If Other, specify:
Research Initiative
(MURI)
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? N
Funded Grant? Y ONR
Institutional Proposal #: Amount Requested: Area(s) of Operation:
$3M NP9
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 10/01/04 Begin: 36N
Grant #: End Date: 9/30/07 End: 38N
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2006 Point Sur 7 7/25/06-7/31/06 8/01/06-8/07/06
2006 Point Sur 21 8/7/06-8/31/06
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
28 Start: Intermediate: End:
Number in Science Party: Moss Landing Moss Landing Moss Landing
12
===============================================================================
Equipment Required:
_ Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Leg I (7 days) is primarily a CTD survey to initialize models. Perhaps a few
moorings will also be deployed. Part II (21 days) is primarily AUV (Odyssey,
H. Schmidt) and glider (Scripps, R. Davis; WHOI, D. Fratantoni) servicing.
Recover moorings. Possibly some use by ONR AESOP collaborating investigators.
===============================================================================