UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20050601172050ID
Version #: 001
Last Modified: 2005/06/01 17:20 EDT
Date Issued: 2013/05/22 06:59 EDT
===============================================================================
P.I. Name Last: Plant First: William MI: J
===============================================================================
Institution: Applied Physics Laboratory / Research vessel required for:
University of Washington _ Ancillary Only
Address: 1013 NE 40th St X Principal Use
Seattle, WA 98105-6698 _ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: 206-543-7836 Fax: 206-543-6785 Email: plant@apl.washington.edu
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
Guy Meadows University of
Michigan
===============================================================================
Proposal Title:
---------------
MURI - Optimal Vessel Maneuvering
===============================================================================
Large Program Name: Other Research Purpose: Physical Oceanography
If Other, specify: Multi-University If Other, specify:
Research Iniative
(ONR)
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? Y
Funded Grant? Y ONR Canada, USA
Institutional Proposal #: Amount Requested: Area(s) of Operation:
ONR BAA 04-021 $5.3 M NP6
Agency Proposal #:
Lat/Long:
Renewal? N Start Date: 05/01/2005 Begin: April 1, 2006
Grant #: End Date: 04/30/2010 End: Aoril 8, 2006
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2006 Thomas G. Thompson 7 4/1/06-4/8/06 4/15/06-4/22/06
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
8 Start: Intermediate: End:
Number in Science Party: Seattle Seattle
4
===============================================================================
Equipment Required:
_ Vans X P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
Would like to tap into ship's radar IF signal to record it.
===============================================================================