                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20050929200037UL                                            
Version #:          004                                                         
Last Modified:      2005/10/19 11:10 EDT                                        
Date Issued:        2010/02/09 19:44 EST                                        
=============================================================================== 
P.I. Name    Last: Rogers                   First: Kenneth            MI: E     
=============================================================================== 
Institution: SPAWARSYSCEN SAN DIEGO 2714        Research vessel required for:   
Address:     53560 HULL STREET                   _ Ancillary Only               
             SAN DIEGO, CA 92152-5001            X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 619-553-1521    Fax: 619-553-5229    Email: ken.rogers@navy.mil          
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Mark Gillcrist      SPAWARSYSCEN        Thomas Tucker       SPAWARSYSCEN        
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
DADS PROJECT SAN2 SEA TEST                                                      
=============================================================================== 
Large Program Name: Other            Research Purpose: Other                    
If Other, specify: ONR FNC           If Other, specify: DADS Demonstration      
                                                     Project                    
=============================================================================== 
New Proposal? N               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? Y                ONR                                              
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
                                                       NA9                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date:              Begin: 4 Dec 2005        
Grant #:                      End Date:                End:   22 Dec 2005       
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2005     New Horizon           4           12/06-21/2005                        
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 4                                 Start:         Intermediate:  End:           
Number in Science Party:           San Diego      San Diego      San Diego      
 14                                                                             
=============================================================================== 
Equipment Required:                                                             
_ Vans                       _ P-Code GPS    _ MCS   _ Alvin    _ ABE           
X Dynamic Positioning        X Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
R/V Sproul is adequate ship for us if sci crew is embarked/disembarked daily.   
Radar and DGPS with accurate UTC time and track recording.                      
GPS attitude and heading sensors highly desirable when working with vertical    
boom over the side.                                                             
Waypoints will be provided.                                                     
Own ship and nearby large ship (>50 ft LOA) tracks (within 1 nmi of deployed    
equipment) should be recorded to 1-second and 10-meter accuracy if possible.    
Transducer boom needed for survey of equipment positions.  We provide           
transducers.                                                                    
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
Mobilize 4-5 DEC at MARFAC. Begin operations on 7 Dec at 0001 with fathometer   
survey of deployment area. At first light, deploy equipment and conduct special 
runs off San Diego 7-8 DEC (24-hour ops). Evening of 7 Dec conduct survey with  
our special transducers over the equipment.  Resume daytime ops on 8 DEC with   
possible evening ops until final survey is completed.  All personnel will be on 
board the entire time. Night ops require minimal ship's crew and scientific     
crew. Conduct special runs at night and recover during daylight 20-21 DEC.      
Demobilize 22 DEC at MARFAC. Dynamic positioning is desired if available, but   
not required. Deployment of bottom line array requires slowest possible headway 
into the weather, along a precise straight track.  Recovery requires backing    
along the deployment line in the same or reverse direction as deployment.       
Project will provide special fairlead and drop slide to mount on the stern      
under the A-frame, and a special constant-tension winch with its own diesel     
hydraulic power unit.  Project will provide interfaces to all special           
equipment, preferably to standard bolt pattern, after consultation with ship's  
crew.  Operations on 6-7 DEC during daylight hours will involve up to 14        
scientific crew. Nighttime ops will involve fewer people. Operations on 20-21   
DEC will be similar.  If sea state >3 on 6-7 DEC, deployment operations would   
shift to the 20-21 DEC date, with recovery on or after 3-4 JAN 2006.            
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? _ No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   _ Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc):                                       
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   _ 0.680"    _ GPS                  _ Inmarsat      
_ Hydro         _ 9/16"      _ 0.322"    X DGPS                 _ ATS           
X CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
X Capstans      _ 1/4"       _ Single    X Dynamic Positioning  _ Cellular      
                             _ Multi     _ Other                _ SEANET        
------------------------------------------------------------------------------- 
X 12 kHz Echosounder       X Multibeam Sounder        _ Air Compressor          
X 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               _ Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
X CTD                                                 _ Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            _ PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                _ Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  _ IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
                                                                                
=============================================================================== 

PDF/ASCII format to: