=============================================================================== 
                  UNOLS Ship Time Request Form - Section ONE                    
=============================================================================== 
UNOLS Request ID #: 20051219120741CY                                            
Version #:          005                                                         
Last Modified:      2006/03/17 11:39 EST                                        
Date Issued:        2009/11/22 01:29 EST                                        
=============================================================================== 
P.I. Name    Last: Gabriel                  First: Robert             MI: B.    
=============================================================================== 
Institution: Naval Undersea Warfare Center      Research vessel required for:   
Address:     1176 Howell Street                  _ Ancillary Only               
             Newport, RI  02841-1708             X Principal Use                
                                                 _ No Ship Required             
                                                 _ Long Range Planning Document 
=============================================================================== 
Phone: 401-832-8179    Fax: 401-832-3736    Email: gabrielrb@npt.nuwc.navy.mil  
=============================================================================== 
Co P.I. Name        Institution         Co P.I. Name        Institution         
------------        -----------         ------------        -----------         
Joe Muhitch         NUWC                Susan LaShomb       NUWC                
=============================================================================== 
Proposal Title:                                                                 
---------------                                                                 
Riptide Program                                                                 
=============================================================================== 
Large Program Name: Other            Research Purpose: Other                    
If Other, specify: Task Force ASW    If Other, specify: Acoustic Trials         
=============================================================================== 
New Proposal? Y               Agency Submitted to:    Foreign EEZ?  N           
Funded Grant? N                Other                                            
Institutional Proposal #:     Amount Requested:       Area(s) of Operation:     
 Navy Funded                                           NP9                      
Agency Proposal #:                                                              
                                                      Lat/Long:                 
Renewal? N                    Start Date: 04/21/06     Begin: 31N118W           
Grant #:                      End Date:   04/29/06     End:   31N118W           
                                                                                
=============================================================================== 
         Ship(s) Requested     # Science                                        
Year     (Name or Size)        Days Req.   Optimum Dates     Alternate Dates    
----     -----------------     ---------   -------------     ---------------    
2006     New Horizon           8 on        04/19/06 -                           
                                 station     04/29/06                           
                                                                                
                                                                                
                                                                                
                                                                                
=============================================================================== 
Total Science & Ship Days Needed:  --------------- PORTS ------------           
 11                                Start:         Intermediate:  End:           
Number in Science Party:           Nimitz Marine                 Nimitz Marine  
 12                                  Facility,                     Facility,    
                                     Point Loma,                   Point Loma,  
                                     CA                            CA           
                                                                                
=============================================================================== 
Equipment Required:                                                             
_ Vans                       X P-Code GPS    _ MCS   _ Alvin    _ ABE           
_ Dynamic Positioning        _ Multibeam     _ SCS   _ ROV      _ 680 Cond.     
_ Helicopter Operation                                                          
=============================================================================== 
Other Special Equipment; Comments:                                              
----------------------------------                                              
Riptide System                                                                  
1.  Towed acoustic source housed in a tow body and stored on Cart (weight:      
1,016 lbs).  Need A-frame to deploy at 3 - 5 knots, and tow at 10 -12 knots.    
Tow cable Sheave and Tension Link Load Cell provided by Project  (weight:  82   
lbs).  Winch (6' x 6' x 8') and Tow Cable (weight: 7,250 lbs) provided by       
Project.  Winch requires 440 VAC, 60 Hz, 3 phase, 30 amps.                      
2.  Data Acquisition and Excitation Systems (housed in two Equipment Racks and  
on workbench):                                                                  
Four laptop computers, two L6 Amplifers, a breakout box, and two instrument     
cases (one 120 VAC, 60 Hz, 1-Ph, 30-amp circuit; two 120 VAC, 60 Hz, 1-Ph,      
20-amp circuits; and one 440 VAC, 60 Hz, 1-Ph, 20 or 30-amp circuit) (weight:   
900 lbs).                                                                       
SONO Bouy receiver and antennas, Aproximate weight 30# antennas to be mounted   
to ships hand rail on top of wheelhouse.                                        
RF Equipment:                                                                   
Antenna with two horns, and Project Van (8' x 8' x 12') (weight:  4,000 lbs).   
Power required 208 volts WYE 1 phase 60 Hz 30 to 40 amps, 120 60 Hz 1 phase 30  
amps.                                                                           
Miscellaneous:                                                                  
Spare equipment and tools (weight:  500 lbs)                                    
=============================================================================== 
=============================================================================== 
                   UNOLS Ship Time Request Form - Section TWO                   
=============================================================================== 
Other Scientists Involved in Multi-P.I. Program:                                
------------------------------------------------                                
Name             Institution            Phone          E-mail                   
----             -----------            -----          ------                   
Joe Muhitch      NUWC                   401-832-2164   muhitchjm@               
                                                         npt.nuwc.navy.mil      
Nathaniel Lewis  NUWC                   401-832-6532   lewisnj@                 
                                                         npt.nuwc.navy.mil      
                                                                                
                                                                                
=============================================================================== 
Are there special considerations of the science party or cruise scheduling?     
Consider science time constraints; coordination of equipment shipping;          
two-ship operations; weather windows; mooring turn-around; teaching schedules   
and others that will affect scheduling decisions.                               
-------------------------------------------------                               
Underway will need to be 0001 on 21 April 2006. Expect to RTP mid-day 28 april  
2006. Initial destination San Clementi Island, Need to arrive between 0800 and  
0830 initial tow testin to be there until mid afternoon. plan to loiter for     
rest of the day and transit over to original submitted Lat and Long.            
=============================================================================== 
SCUBA Diving? X No   _ Yes -- Designate Lead Institution:                       
# Individual dives:                     # Divers on board:                      
A list of all divers and their certification information must be submitted      
to the ship's marine superintendent.                                            
=============================================================================== 
Special Science Party Considerations                                            
_ Foreign Nationals    _ Medical Conditions    _ Disabled Persons    _ Other    
Please explain:                                                                 
---------------                                                                 
                                                                                
=============================================================================== 
Use of Hazardous Materials? _ No   _ Yes                                        
If Yes, List type, quantity, and disposal plans:                                
------------------------------------------------------------------------------- 
Radioactive?  Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Explosives?   Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
------------------------------------------------------------------------------- 
Other?        Type:                           Quantity:                         
Disposal Plan:                                                                  
--------------                                                                  
                                                                                
=============================================================================== 
Have you read the RVOC Safety Training Manual-Chapter 1? _ No   X Yes           
=============================================================================== 
Technician Required (CTD, SCS, MSC, etc): CTD                                   
=============================================================================== 
                              Equipment to be used:                             
------------------------------------------------------------------------------- 
Winches:        Wire:        Conductor   Navigation:            Communication:  
_ Dredge/Trawl  Mechanical   _ 0.680"    X GPS                  _ Inmarsat      
_ Hydro         _ 9/16"      _ 0.322"    _ DGPS                 _ ATS           
X CTD           _ 1/2"       _ .225"     _ Loran                _ FAX           
_ Capstans      _ 1/4"       _ Single    _ Dynamic Positioning  X Cellular      
                             _ Multi     _ Other                X SEANET        
------------------------------------------------------------------------------- 
X 12 kHz Echosounder       _ Multibeam Sounder        _ Air Compressor          
_ 3.5 kHz Echosounder      _ Magnetometer                                       
------------------------------------------------------------------------------- 
                           Vans:                      Nets:                     
_ Pingers                  _ Refrigerated             _ Dip net                 
_ Gravity Corers           _ Magazine                 _ Plankton                
_ Piston Corers            _ Isotope Isolation        _ Neuston                 
_ Box Corers               X Lab                      _ Bongo                   
_ Rock Dredges             _ Storage                  _ Mid-water trawl         
_ Airgun/watergun system   _ Berthing                 _ MOCNESS                 
_ Explosive Handling Gear  _ Chest Freezers             (Size):                 
_ Thermometers             _ Refrigerators            _ Work boats              
X CTD                                                 X Computer/peripherals    
_ Rosette Sys.             _ Auto Analyzer            X PC computers            
_ Niskin bottles           _ Salinometer              _ SAIL system             
  Size:                    _ Nutrients                X Digital XBT             
  and number:              _ Oxygen titration         _ ADCP                    
                           _ Liquid Scintillation     _ Gravimeter              
                           _ Uncontaminated seawater  X IMET                    
=============================================================================== 
Other Special Equipment; Equipment Requiring Special Handling, Storage or       
Installation; Comments:                                                         
-----------------------                                                         
Riptide System                                                                  
1.  Towed acoustic source housed in a tow body and stored on Cart (weight:      
1,016 lbs).  Need A-frame to deploy at 3 - 5 knots, and tow at 10 -12 knots.    
Tow cable Sheave and Tension Link Load Cell provided by Project  (weight:  82   
lbs).  Winch (6' x 6' x 8') and Tow Cable (weight: 7,250 lbs) provided by       
Project.  Winch requires 440 VAC, 60 Hz, 3 phase, 30 amps. Installation of the  
winch will require welding to 4 pads, provided by end-user, to allow mounting   
to ships 2X2 deck hold down bolt pattern.                                       
2.  Data Acquisition and Excitation Systems (housed in two Equipment Racks and  
on workbench):                                                                  
Four laptop computers, two L6 Amplifers, a breakout box, and two instrument     
cases (one 120 VAC, 60 Hz, 1-Ph, 30-amp circuit; two 120 VAC, 60 Hz, 1-Ph,      
20-amp circuits; and one 440 VAC, 60 Hz, 1-Ph, 20 or 30-amp circuit) (weight:   
900 lbs).                                                                       
UPS for computer system and SONO Bouy receiver, 100# total, has VHF antennas (2 
ea) to be mounted to the ships handrails above the bridge.                      
RF Equipment:                                                                   
Antenna with two horns, and Project Van (8' x 8' x 12') (weight:  3,000 lbs).   
Miscellaneous:                                                                  
Spare equipment and tools (weight:  500 lbs)                                    
=============================================================================== 

PDF/ASCII format to: