UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 20070826154535RP
Version #: 015
Last Modified: 2007/09/04 07:37 EDT
Date Issued: 2010/07/31 14:11 EDT
===============================================================================
P.I. Name Last: Southall First: Brandon MI: L
===============================================================================
Institution: National Marine Fisheries Service Research vessel required for:
Address: 1315 East-West Hwy. _ Ancillary Only
Silver Spring, MD 20910 X Principal Use
_ No Ship Required
_ Long Range Planning Document
===============================================================================
Phone: (301) 713–2322 Fax: (310) 713-0376 Email: brandon.southall@noaa.gov
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
P. Tyack Woods Hole I.L. Boyd SMRU, University
Oceanographic of St Andrews
Institution
===============================================================================
Proposal Title:
---------------
Behavior and distribution of beaked whales: development of mitigation method
for responses to sonar(Ian Boyd, PI; James Eckman ONR program manager)
===============================================================================
Large Program Name: None Research Purpose: Biological Oceanography
If Other, specify: If Other, specify:
===============================================================================
New Proposal? N Agency Submitted to: Foreign EEZ? Y
Funded Grant? Y ONR Bahamas
Institutional Proposal #: Amount Requested: Area(s) of Operation:
N00014-07-1-0988 553,000 AN9
Agency Proposal #:
N00014-07-1-0988 Lat/Long:
Renewal? N Start Date: 07/01/07 Begin: 24N 77W
Grant #: End Date: 06/30/10 End: 24N 77W
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
2008 Large 42 6/1/08 8 /15/08 8/16/08-8/31/08
===============================================================================
Total Science & Ship Days Needed: --------------- PORTS ------------
42 Start: Intermediate: End:
Number in Science Party: Nassau, None Nassau,
22 Bahamas Bahamas
===============================================================================
Equipment Required:
X Vans _ P-Code GPS _ MCS _ Alvin _ ABE
_ Dynamic Positioning _ Multibeam _ SCS _ ROV _ 680 Cond.
_ Helicopter Operation
===============================================================================
Other Special Equipment; Comments:
----------------------------------
1. US-Navy supplied mid-frequency research source
2. Industry-supplied single airgun source
3. Big-eye binoculars mounted on flying bridge
4. RHIB deployable from ship
===============================================================================
===============================================================================
UNOLS Ship Time Request Form - Section TWO
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
P. Tyack Woods Hole Institute 508-289-2818 ptyack@whoi.edu
of Oceanography
I.L. Boyd SMRU, University of St 44-1334-463628 ilb@st-andrews.ac.uk
Andrews
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
1, The activity being undertaken is very dependent upon calm weather (wind
speeds <10 knots). It is, therefore, essential to deploy during the time of
year that will maximise the opportunities for the research to take place.
2. Timeframe: Require 7 consecutive weeks of vessel availability, not including
transit from/to vessel homeport. Seven-week time period may occur any time from
6/1/08 through 8/31/08.
3. Require at least two (2) visual observer positions with total 360 deg arc
coverage (i.e., each position at least 180 deg arc coverage), using big eyes;
optimum location on flying bridge above pilot house.
4. We will need to be able to deploy and recover a 18' RHIB from the ship
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
X Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
This will be a multi-national team consisting of citizens from:
United States, Bahamas, United Kingdom, Italy, Germany
===============================================================================
Use of Hazardous Materials? X No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No _ Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc):
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical _ 0.680" _ GPS X Inmarsat
_ Hydro _ 9/16" _ 0.322" X DGPS _ ATS
_ CTD _ 1/2" _ .225" _ Loran X FAX
_ Capstans _ 1/4" _ Single _ Dynamic Positioning X Cellular
_ Multi _ Other X SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder _ Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers X Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
X Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size): 4-6m
_ Thermometers _ Refrigerators X Work boats
_ CTD X Computer/peripherals
_ Rosette Sys. _ Auto Analyzer X PC computers
_ Niskin bottles _ Salinometer _ SAIL system
Size: 120 cu in _ Nutrients X Digital XBT
and number: 1 _ Oxygen titration _ ADCP
_ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater _ IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
1. US-Navy supplied mid-frequency research source and van (30 ft x 40 ft; 24K
lb.; power requirements 208 VAC WIE (60 AMP service breaker); 480 VAC 3-phase
(60 AMP service breaker).
2. Winch for source(including 2,500 ft of cable): 10 ft x 10 ft; 12K lb. Power
requirements: 480 VAC 3-phase (60 AMP service breaker).
3. Industry-supplied single 120 cu in. airgun source; all airgun support
equipment will be supplied except for the ship A-frame used to deploy it. The
support equipment includes compressor, HP air bottles, firing unit with
energizer solenoid, air hose, and electric cables.
4. Two big eye binoculars will need to be installed; optimum location on flying
bridge above pilot house. Visual observer positions will need to cover a total
360 deg arc coverage (i.e., each position at least 180 deg arc coverage). need
to confirm no problems with observers working on roof of pilot house, e.g. no
hazard from radar etc.
===============================================================================