R/V Oceanus 2007 FINAL Schedule
=======================================================================
Total days: 171; NSF 63, ONR 83, WHOI 14, 11 NOAA
10/30: Removed German Oct cruise. Move to 2008.
09/05:Added day to trasnit from Southampton to WHOI due to weather
delay.
08/15: Removed Collins. Shifted dates of Sept and Oct cruises.
08/06: Added days to Sept maint period, changed dates of WHOI funded
programs.
08/3: Changed charge days for deMenocal and non-op in Southampton
07/30: Changed end date of deMenocal to 7/24. Added WHOI non-op period
Aug 7-10.
07/18: Added pending cruise for Anderson in Oct.
07/11: Changed arrival into Lisbon to 7/1.
06/26: changed departure date from La Sepzia (6/25) to 6/26.
05/29: Added unscheduled port stop in Pozzallo 5/23-5/29 for main
engine repairs.
05/17: Added WHOI funded cruises.
05/08: Changed Preston Siracusa port stop to June 7th from the 8th.
04/23: Changed Toole departure to 4/8 & arrival to 4/14. Moved 1 day to
Nov cruise.
04/23: Added 4 WHOI days to deMenocal cruise & shifted following cruise
4 days later
04/03: Changed UK port stops to Southampton
03/22: Moved June 8 in port for Preston to Siracusa
03/22: Shifted Preston port days and in port period.
03/22: Added ONR program off UK, Ryan 8-14 Aug.
03/05: Collins moved to later in the year, dates TBD.
03/02: Split La Spezia - Lisbon transit 3 NSF, 2 ONR
02/21: Added 2 port stops for Preston cruise
02/21: Cut 1 day from Collins and charged one day to Other
02/21: Moved Toole cruise to Nov 5th.
02/09: Changed arrival date on transit, Charleston to WHOI
02/09: added NSF Inspection Oct 24-25
02/05: Arrival at Charleston shipyard on 2/6.
01/29: Added transit to/from shipyard in Charleston
01/23: Changed arrival from the shipyard. Shifted March to Aug. cruises
1-2 days earlier. # of days remains 156.
11/6: Moved Collins 06 cruise (4 days) to April 07.
Eglinton 4 days cruise (OCE-0425677) need to go Endeavor and not overlap
with deMenocal.
=======================================================================
DAYS/AGENCY/
CRUISE MAP INDEX/AREA/ P.I./INSTITUTION/ PORTS STATUS/
DATES PURPOSE PROPOSAL NO. CLEARANCE
=======================================================================
01 JAN NA6// Suchy, A./WHOI/ WHOI 33(Non-Op)/
02 FEB open WHOI Other/F
03 FEB NA6// Transit/WHOI/ WHOI 4(Non-Op)/
06 FEB Transit Charleston Other/F
Transit to Shipyard in Charleston.
----------
07 FEB NA6// Suchy, A./WHOI/ Charleston 38(Non-Op)/
16 MAR Shipyard Charleston Other/F
Shipyard in Charleston
----------
17 MAR NA6// WHOI/Transit/WHOI/ Charleston 4/PRV/F
20 MAR Equip Testing NA WHOI
Testing of Long core system components and shipboard science equipment during
transit from Charleston Shipyard to WHOI.
----------
21 MAR NA6// Suchy, A./WHOI/ WHOI 18(Non-Op)/
06 APR Maintenance WHOI Other/F
7
08 APR NA6/NW. Atl/ Toole, J./WHOI/ WHOI 8/NSF/F
14 APR CLIMODE Moorings OCE-0241354 WHOI
7 science, 1 port. Science party requested to delay departure. PI Requested
Oceanus. PI needs to load mooring gear at WHOI. Requested April
----------
15, 16, 17, 18, 19 (non-op)
20 APR NA6// Transit/WHOI/ WHOI 16/NAVY/F
05 MAY Transit ONR La Spezia,
WHOI to La Spezia 3975, 15.1 days
----------
6, 7, 8
09 MAY NA8/Malta Channel/ Preston, J./Penn / La Spezia, 19/NAVY/F
23 MAY Clutter S/N00014-05-1-0156 Pozzallo Italy
24
19 science, 4 port. Unscheduled port stop in Pozzallo 5/23-5/29 for main engine
repairs. Two ship operations with Alliance. FORA towed array. Alliance dates:
Load 7-8th May, Transit 9-10th May, On Station 11th May.
----------
25 MAY NA8// WHOI/WHOI/ In port, Po 4(Non-Op)/
28 MAY Repairs In port, Po Other/F
Unscheduled port stop in Pozzallo 5/23-5/29 for main engine repairs.
----------
29 MAY NA8/Malta Channel/ Preston, J./Penn / Pozzallo 4/NAVY/F
01 JUN Clutter S/N00014-05-1-0156 Siracusa Italy
4 science. FORA towed array. Two ship operations with Alliance. Alliance dates:
Load 7-8th May, Transit 9-10th May, On Station -11th May, Clutter finished
28th May, Arrive La Spezia - 8th June.
----------
2
03 JUN NA8/Malta Channel/ Preston, J./Penn / Siracusa 6/NAVY/F
07 JUN Base S/N00014-05-1-0156 Siracusa Italy
6 science, 1 port. FORA towed array. Two ship operations with Alliance. Port
stop on June 7th to transfer science party. *June 2 Italian holiday, Republic
day.
----------
07 JUN NA8/Malta Channel/ Preston, J./Penn / Siracusa 17/NAVY/F
22 JUN Base S/N00014-05-1-0156 La Spezia, Italy
23, 24 (25 non-op)
14 science, 2 port (June 7th not counted in charge days). FORA towed array. Two
ship operations with Alliance. June 25th Italian holiday, St John's day.
----------
26 JUN NA8// Transit/WHOI/ La Spezia, 2/NAVY/F
01 JUL Transit ONR Lisbon
NA8// Transit/WHOI/ 3/NSF/F
Transit NA
NA8// Transit/WHOI/ 1(Non-Op)/
NA Other/F
1175nm, 4.4 days. (Departed a day earlier than scheduled, 6/27 to 6/26. 26 was
a non-op in port day).
----------
2, 3, 4
05 JUL NA7,NA10// deMenocal, P/LDEO/ Lisbon 24/NSF/F
24 JUL coring OCE-0402348 Cape Verde Portugal,
Morocco,
Mauritania
, Spain,
Cape Verde
NA10// Eglinton, T/WHOI/ 0/PRV/F
CTD NA
25
20 science days, 4 port. Cape Verde port stop in Praia (Santiago Island).
Senegal clearance was applied for and approved but not used. Ship departed work
area early due to engine problems.
----------
26 JUL NA5,NA7// Transit/WHOI/ Cape Verde 10/NAVY/F
05 AUG Transit NA Southampton
NA5// Transit/WHOI/ 2(Non-Op)/
NA Other/F
6
Cape Verde to Southampton 2496nm, 9.5 days (DbP), 10 calendar. Departed CV
early and added port days for engine repairs at NOC.
----------
07 AUG NA5// Suchy, A./WHOI/ Southampton 3/PRV/F
09 AUG Maintenance NA Southampton
10 (non-op)
WHOI funded in -port non-op days. Engine repair and spare generator.
----------
11
12 AUG NA5// Ryan, M/ Southampton 9/NAVY/F
18 AUG ONR/Ocean Tech/NA Southampton
19
9 days: 2.4 transit, 1 day arr/dept, 3.5 science, 2 port.
Ryan will load gear on Aug 11th.
----------
20 AUG NA6// Transit/WHOI/ Southampton 13/NSF/F
01 SEP Transit NSF WHOI
Southampton to WHOI 3000nm, 11.4 days (dbP), 12 calendar. 13 with weather
delay.
----------
05 SEP NA6// Weller, B./WHOI/ WHOI 1/PRV/F
05 SEP Moorings WHOI WHOI
1 day for deployment of test wave mooring.
----------
06 SEP NA6// Suchy, A./WHOI/ WHOI 22(Non-Op)/
27 SEP Maint/Gen repair WHOI Other/F
28 SEP NA6// Weller, B./WHOI/ WHOI 6/PRV/F
03 OCT Moorings WHOI WHOI
1 day for recovery of wave mooring testing, 5 days for recovery of remainder of
CLIMODE mooring.
----------
08 OCT NA6/Gulf of Maine/ Anderson, D/WHOI/ WHOI 11/NOAA/F
18 OCT Red Tide NA WHOI Canada
24 In Port, 25 at Sea
24 OCT NA6// NSF Inspection/ WHOI 2(Non-Op)/
25 OCT NSF Insp WHOI/ WHOI Other/F
NSF Inspection. Oct 24th in port, Oct 25th at sea.
----------
05 NOV NA6/NW. Atl/ Toole, J./WHOI/ WHOI 14/NSF/F
19 NOV CLIMODE Moorings OCE-0424865 WHOI
NA6// Toole, J./WHOI/ 1/NSF/F
Station W OCE-0241354
15 science. PI Requested Oceanus. Start/End cruise at WHOI to offload mooring
gear. Requested 11/01 or 11/15.
Full recovery of moorings.
----------
20 NOV // Suchy, A./WHOI/ WHOI 42(Non-Op)/
31 DEC open WHOI Other/F
Agency Funded Proposed TOTAL
------ ------ -------- -----
NAVY 83.0 0.0 83.0
NOAA 11.0 0.0 11.0
NSF 63.0 0.0 63.0
PRIVATE 14.0 0.0 14.0
------ ----- ----- -----
TOTAL 171.0 0.0 171.0