POC: Liz Caporelli LAST UPDATED: 2008/01/21 10:37 EST
Marine Operations
Woods Hole Oceanographic Institution
38 Water St.
Mail Stop-37
Tel: 508-289-2277
Fax: 508-457-2185
Email: ecaporelli@whoi.edu
R/V ROV 2007 FINAL Schedule
=======================================================================
12/04: Changed PI on OBS recovery cruise to Wooding/MGG OBSIP
10/09: Updated # of charge days on Garcia, Moyer, Laske
10/05: Addded days to Laske OBS recovery cruise
10/05: Changed dates and ports for Garcia and Moyer
10/05: Duennebier cruise removed. Will be rescheduled in 2008
08/07: Added OBS recovery cruise for Laske. Shifted dates and ports of
following cruises.
02/19: Changed end port for NOAA-OE cruise to Galveston and PI to
Fisher.
01/04: Added 2 Infrastructure dives/days (Fornari) to Klein cruise (1
day from Shank/Lutz and 1 day from Von Damm).
12/08: Changed NOAA-OE cruise dates to June 4th to July 6th.
11/18: Shifted Klein cruise one day later
11/02: reduced Bowen HROV science days from 10-9.
=======================================================================
DAYS/AGENCY/
CRUISE MAP INDEX/AREA/ P.I./INSTITUTION/ PORTS STATUS/
DATES PURPOSE PROPOSAL NO. CLEARANCE
=======================================================================
20, 21, 22, 23
24 JAN NA10/15 N on the MAR/ Borowski, C./ Fort de Fra 27/Other/P
14 FEB Jason MPI Germany/NA Las Palmas
15
22 science, 5 port. R/V Maria S.Merian, Martinique to Canary Islands.
Logatchev Hydrothermal Vent Field located at 15 N on the MAR.
Dr. Christian Borowski, Max Planck Institute for Marine Microbiology, Germany.
----------
21, 22, 23
24 MAR NP12/EPR/ Klein, E./Duke/ Manzanillo 35/NSF/F
27 APR Jason (Non-Alvin) OCE-0526120 San Diego
NP13/EPR/ White, S./USC/ 2/NSF/F
DSL-120 NA
/EPR/ Fornari, D./WHOI/ 3/NSF/P
Jason ISS NA
28, 29
R/V Atlantis. 26 science, 8 transit, 1 day arr/dept, 5 port (extra port day
for Jason loading). Science days: 21 Klein, 2 White, 3 Fornari (ISS). PI
requested ROV, Non-Alvin cruise. Request to go after March 15th so Von Damm can
participate. (EPR-ISS site infrastructure dive)
(JII needs to get to FL by early June for NOAA Brown cruise).
----------
1, 2, 3
04 JUN NA9/Gulf of Mexico/ Fisher, C./ Ft. Lauderd 36/NOAA/F
06 JUL Jason NOAA-OE/NA Galveston
NA9// Bowen, A./WHOI/ 1/NOAA/F
Jason Eng dive NA
7
NOAA Ship Ronald H. Brown. ROV/Jason cruise. OE in joint-funding with MMS. 37
days total: 32 OE days, 1 Jason II Eng dive, 4 port (on-load days June 1, 2, 3.
offload July 6, 7). July 6th will be used as an offload day if 8 am arrival. If
offloading does not start on the 6th an additional charge day will be added.
Chuck Fisher is Chief Scientist.
----------
19, 20, 21
22 JUL NP9/36deg44'N, Rathburn,A/Indian San Francis 13/NSF/F
29 JUL 122d/Jason (Non-Alvin) St U./OCE-0550401 Astoria
30, 31
R/V Atlantis. ROV required.
4 science, 1 day arrival/departure, 3 transit, 5 port. PI requested ROV.
Station: 36deg44'N, 122deg16'W. SF to station 77nm/.3 days, Station to Astoria
603nm/2.2 days.
----------
1, 2
03 AUG NP9/JdF Ridge/ Embley,R/PMEL/ Astoria 18/NOAA/F
20 AUG Jason (Non-Alvin) na Astoria Canada
NP6/Main Endeavor/ Di Iorio, D./U Geo 4/NSF/F
2 Jason days rgia/OCE-0449578
21, 22
R/V Atlantis.22 days:15-16 science, 2-3 transit, 4 port. Embley: ROV required.
20 days max,
15 min.. DiIorio: 2 ROV days. Needs 2-4 months between cruises. Embley 46N,
130W (Axial Volcano) to Astoria 257nm/1 day. Diorio Main Endeavor vent Field:
47deg 56.88N, 129deg 5.94W to Astoria 239nm/.9 days. DiIorio to Embley
122nm/.5day.
----------
7, 8, 9
10 SEP NP12/Hawaiian Islands/ Garcia, M./UHI/ Honolulu 33/NSF/F
08 OCT Jason OCE0510482 Honolulu
9
R/V Kilo Moana. 29 science, 4 port. Kilo Moana arrives in the morning on the
day of arrival. This is considered a in port day on the ROV schedule.
----------
10
11 OCT NP12/Hawaiian Islands/ Moyer ,C./WWU/ Honolulu 19/NSF/F
27 OCT Jason MCB0348734 Honolulu
28
R/V Kilo Moana. 15 days science, 2 port, 2 transit. Kilo Moana arrives in the
morning on the day of arrival. This is considered a in port day on the ROV
schedule.
----------
29, 30
31 OCT NP12// Wooding, B./WHOI/ Honolulu 15/NSF/F
10 NOV OBS Recovery MGG OBSIP Honolulu
11, 12
11 science, 4 port
----------
16
17 NOV NP12/Deep Water/ Bowen, A./WHOI/ Honolulu 13(Non-Op)/
27 NOV HROV test with Jason Honolulu NSF/F
NP12// Bowen, A./WHOI/ 1/NSF/F
Jason Eng dive
28, 29
HROV test with Jason. 10 science days +1 ROV, 3 port.
Schedule after April. Jason will be onboard but not used unless needed.
Kilo Moana arrives in the morning on the day of arrival. This is considered a
in port day on the ROV schedule.
----------
Agency Funded Proposed TOTAL
------ ------ -------- -----
NOAA 55.0 0.0 55.0
NSF 122.0 3.0 125.0
Other 0.0 27.0 27.0
------ ----- ----- -----